Approximately 90 feet from the top of the rail to the water in the river. Gas locomotive #4 on the bridge (built by Bill and Sam Culliton). 4 main span strings 90' x 3' diameter. Information from Ed Aldridge. Photo by: Ed Aldridge.
Merrill & Ring Bridge over the little Mamquam (Mashiter Creek) picture taken looking north showing sky line for taking Pile Driver to north side of canyon (1928 - 1929). Left to right: Brian Buckley (?), "Big Dave" Thompson (steel boss-track layer), Freddy Tom (Merrill & Ring car builder son), Billy Dawson (?). Photo by: Ed Aldridge.
Gas Locomotive #4 in far end of cut. Cut taken out by hand on 24" guage push car railway. Cut approximately 30' deep at max 300" long. Photo by: Ed Aldridge.